Public Jobs

Bids due in 16 days
9/6/18 1:00 pm
Newburg R-2 Biomass Boiler
Paragon Architecture
701 Wolf Pride Drive Newburg, MO 65550
The Project consists of the installation of two cordwood boilers ina new boiler house, a new back-propane boiler, a new package unit, and all associated system upgrades to deliver heat and ventilation to the gymnasium and ancillary areas
Bids due in 16 days
9/6/18 3:00 pm
Houston R-1 Biomass Boiler
Paragon Architecture
423 W. Pine, Houston, MO. 65483
to consists of the following:Install a biomass boiler heating system for efficient space heating. The system replaces theoutdated sawdust boiler and oil boilers. The current heating system of the facility will be decommissioned and removed. The project will also involve the removal and replacementof the boiler plant roof and new fossil fuel backup boilers.
Bids due in 2 days
8/23/18 3:00 pm
Drillers Court Addition & Office Remodel & New Office/Warehouse
EDDIE TIMS ARCHITECT
1248 E Atlantic St Springfield MO
2 Separate Projects. Proj #1 Street and Drainage Improvements. Proj #2 Office Addition and Separate New Office Warehouse Building
Bids due tomorrow at 4:00pm
8/22/18 4:00 pm
Old Missouri Bank- Mt Vernon: Furniture
Paragon Architecture
Mt Vernon, MO
The project will consist of assembling and installing furniture for their new branch bank in Mt. Vernon.
Bidding Closed
8/16/18 3:30 pm
Belleview R3 Biomass Boiler
Paragon Architecture
Belleview, MO
The Work of Project is defined by the Contract Documents and consists of the following:Install a pellet boiler and associated system upgrades to deliver heat to the portions ofthe elementary school served by the existing hydronic system and to the old addition which is approximately 3,700 sf and currently heated by a propane furnace
Bidding Closed
8/16/18 2:00 pm
LEBANON R-3 SCHOOL DISTRICT DOCK AND FREEZER ADDITION
Sapp Design Associates
Lebanon, Missouri
consists of construction of a new covered loading and receiving dock and a Walk-in Freezer Warehouse on the southeast corner of the existing JH Facility. The work consists of, but is not limited to new construction of concrete dock walls and foundation walls, a canopy over the dock area.