Public Jobs

Bids due in 24 days
1/8/19 10:30 am
Mt Vernon Street Bridge over Jordan Creek
City of Springfield
Springfield, MO
This project consists of the removal and replacement of the existing Mt Vernon Street Bridge over Jordan Creek. The existing structure will be replaced with a 4 celled 10'x16' box culvert with floor, end cap sections and wing walls consisting of 55.900 lbs of reinforcing steel, 533 cy of class B-1 concrete. Other items included in this project included, approximately 600 linear foot of curb and gutter, 550 sy of roadway pavement, 389 sy of asphalt trail pavement, various storm infrastructure, 1350 sf of sidewalk, 4838 cy of excavation , 1,634 sf of modular block retaining wall, rip-rap and other water quality features.
Bids due in 31 days
1/15/19 4:00 pm
Gascosage Facade
Paragon Architecture
Dixon, MO 65452
The Gascosage Electric Fa├žade Improvements project consists of a manufactured stone veneer overlay over existing brick veneer. Work also includes aluminum storefront replacement at the entry vestibule,window replacement, painting, brick repair, tuck pointing, copings and flashings
Bids due in 24 days
1/8/19 3:00 pm
Willard Intermediate School South - Furniture Package
Paragon Architecture
Willard, MO
Consists of six (6) Trade Contracts for complete furniture delivery, handling and installation.
Bids due in 5 days
12/20/18 3:00 pm
CC Cassville Campus Remodel and Addtions
Paragon Architecture
4020 Main St, Cassville, MO 65625
Interior and exterior remodel of existing building with two potential building additions.
Bids due in 3 days
12/18/18 10:00 am
Smith Park Sanitary Sewer Capacity Improvements
City of Springfield
Smith Park, Springfield MO
The project consists of constructin approximately 1400 LF of 24-inch pipe, varying in depth from 6 feet to 11 feet dep, within Smith Park, In addition to the pipe, six new 5-ft inside diameter manholes, varyin gin depth from 6 ft to 11 feet, and one new 6-ft inside diameter manhole, approximately 6 feet deep, will be installed.