Public Jobs

Bids due in 18 days
4/23/20 3:00 pm
Pythian Parking Lot
CJW Transportation Consultants, LLC
Springfield, Missouri
Bids due in 16 days
4/21/20 3:00 pm
Neosho High School Restroom Upgrades
Paragon Architecture
Neosho, MO
Remodel of eight (8) restrooms throughout the High School. The remodel will be replacement of fixtures, updated finishes, and reconfiguring of current room layout
Bids due in 11 days
4/16/20 3:00 pm
Interior Renovation for ITTC Building Ozarks Technical Community College
Hood-Rich Architecture
1001 E Chestnut Expressway Springfield MO 65802
Bidding Closed
4/1/20 11:00 am
Electrical Switchgear Replacement at Roseann Bentley Administrative Center, Springfield R-XII School
Springfield Public Schools
1610 E. Sunshine St., Springfield, MO, 65804
Replacement of Electrical Switchgear
Bidding Closed
4/1/20 3:00 pm
Bissett Elementary School HVAC Upgrades
True Engineering Group
3014 W. Calhoun Street, Springfield, MO 65802
The project is comprised of replacing and upgrading the existing HVAC system at Bissett Elementary School in Springfield, Missouri. The HVAC system scope includes replacement packaged rooftop units and new VRF systems. The building automation system will also be replaced.
Bidding Closed
4/2/20 2:00 pm
Kenneth E Cowan Civic Center Renovation
Paragon Architecture
500 East Elm Street, Lebanon, MO 65536
Interior renovations including extension of the balcony in lobby to create an indoor walking track, interior finishes, and exterior renovations of the first-floor southern canopy to be removed and replaced along with other Work indicated in the Contract Doucments
Bids due in 2 days
4/7/20 10:30 pm
(2015PW0091) Beechwood Heights
City of Springfield
E Horning Ave & S Elmwood Ave
This project consists of installation of underground stormwater pipe network totaling approximately 1,350 total linear feet of stormwater pipe along E Walnut St. S. Elmwood Ave and E. Horning Ave. The underground stormwater network also includes approximately 250 linear feet of 4'x5' reinforced concrete box culvert and approximately 30 reinforced concrete stormwater structures. The project includes, paving replacement, concrete driveway, and concrete curb and gutter installations. The Contactor shall be responsible for traffic control, erosion and sediment control per the stormwater pollution protection plan (SWPPP), and site restoration following construction. City Utiliites gas and water relocation and renewal work is included in the project scope of work