Gymnasium Floor Replacement, Foster Recreation Center

The gymnasium floor will be replaced at the three basketball courts.

Status

Bidding Closed

Prebid Date3/22/21 2:00 pm

Bid Date3/30/21 2:00 pm

Company & Contacts

Missouri State University

Ashley Sliger   417-836-5101

Location

Springfield Campus, Missouri State University

The gymnasium floor will be replaced at the three basketball courts within Foster Recreation Center. The project includes removal of the existing maple floor, prepping existing plywood sub-floor, installation of the new factory sanded maple floor, striping/finishing and installation of new vent cove base.

Plans are available for a refundable deposit of $50.00 or can purchase in a hard copy or digital download.

Deposit checks need to be made out to MSU Planning, Design and Construction. Plans not returned in 30 days will result in the loss of the deposit check.

For deposit sets, please order through the plan room and select “Deposit” for your payment method.