New FEMA 361 Safe Room Addition for Climax Springs School District

Consists of Project A = A New FEMA 361 Safe room Addition, approx.. 4,428 sf, reinforced masonry wall construction, with brick veneer, metal deck cast in place roof system with EPDM roofing, alum FEMA storefront and FEMA window units, cmu interior partition walls, typical layin ceilings, MEP systems, including a back up power generator. Project B = Site Improvements to include; new paved parking lot and drive lanes, stormwater piping, exterior pavement, a new Entry canopy at the main entrance.

Status

Accepting Bids

Prebid Date4/16/19 2:00 pm

Bid Date4/30/19 2:00 pm

Company & Contacts

Sapp Design Associates

Steve Telscher telscher@sdaarchitects.com   417.877.9600

Location

571 Climax Avenue, Climax Springs, MO 65324

Plans and Specs: Purchase Sets Only
Print: $145.00 Download: $73.00
Purchase price does not include Addenums

Shipping and Handling:
$7.50 fee in addition to UPS shipping cost