Smith Park Sanitary Sewer Capacity Improvements

The project consists of constructin approximately 1400 LF of 24-inch pipe, varying in depth from 6 feet to 11 feet dep, within Smith Park, In addition to the pipe, six new 5-ft inside diameter manholes, varyin gin depth from 6 ft to 11 feet, and one new 6-ft inside diameter manhole, approximately 6 feet deep, will be installed.
  Plans (click to expand/collapse)
This is available for download & digital takeoff to registered users Log in now
Name Size
Smith Park BID PLANS 11-15-18 13.6 MB